HireOrSell logo
All articles
Time & capacity

Billable vs non-billable time: how to decide what counts

A decision list for billable vs non-billable time, with rulings on the awkward cases: rework, meetings, learning and admin. Includes a break-even calculation for your hourly rate.

Cover graphic titled Billable vs non-billable time: how to decide what counts

Every agency has to decide which hours it charges for and which it absorbs. Without clear rules, the decision is made differently by each person on each day, and the result is inconsistent invoices and unclear reports. This post gives you a short decision list and rulings on the cases that cause the most arguments.

What the two terms mean

Billable time is time you charge to a client, either directly by the hour or as part of a fixed fee or retainer that you intend to cover.

Non-billable time is time that supports the business but is not charged to a particular client, such as your own admin, sales, training and internal meetings.

A third label is worth having: billable but not billed. This is time that counted as client work, but you chose not to charge, such as a goodwill fix. Keeping it visible stops absorbed work from looking like free capacity.

A five question decision list

Ask these in order. Stop at the first "yes".

  1. Was it requested by the client or required by the agreed scope? If yes, billable.
  2. Did it only exist because of our own error or poor quality? If yes, non-billable, logged as rework.
  3. Is it work for one specific client that moved their project forward? If yes, billable.
  4. Does it benefit several clients or the business in general? If yes, non-billable, unless you have agreed otherwise.
  5. If you are unsure, record it as non-billable and flag it for the weekly review.

The final question matters. A rule with an escape hatch for doubt keeps people from inventing an answer on the spot.

Edge case: rework

Two kinds of rework look the same in a time log and should be handled differently.

  • Fixing your own mistake. A broken link you published, a figure that was wrong. Non-billable. Log it, so you can see how often it happens.
  • Changing agreed work because the client changed their mind. Billable, if outside the revisions in your scope. Say so before you begin.

When it is unclear, return to the scope document. If the scope says two rounds of revision, a third round is a client change.

Edge case: meetings

  • Meetings with a client about their project: billable.
  • Internal meetings about one client's work: billable to that client, if the time is needed to deliver the project.
  • Internal meetings about the business: non-billable.
  • Sales and proposal calls: non-billable, unless you charge for discovery or paid scoping.

A meeting that covers several clients is a separate problem, with its own allocation rules, so for now put it in a clearly labelled category and flag it for review.

Edge case: learning

Learning is non-billable when it builds general skill. It becomes billable only in two narrow cases: the client asked for work that needs a specific tool or method, and you have said in your estimate that the learning is included. Even then, you may choose to absorb a first-time learning curve. Decide your own rule and write it in the estimate, so the client is not surprised.

Edge case: admin and project management

Coordination for a client, such as scheduling, status updates and handling files, is real work. Treat it in one of two ways.

  • Charge it as its own line: for example, 10 percent of project hours.
  • Include it in your hourly rate and do not log it separately.

Whichever you choose, state it in the estimate. The worst outcome is charging it for one client and forgetting it for another.

A worked example: what the non-billable hours cost

Say a team member works 32 hours in a week. Of those, 22 hours are billable and 10 are non-billable. The share billable is 22 / 32 = 0.6875, or 68.75 percent.

Now say this person costs the agency $2,000 per week in pay and overhead. To break even on that week, each billable hour has to bring in $2,000 / 22 = $90.91, rounded to the cent. If the billable share dropped to 18 hours, the break-even rate would be $2,000 / 18 = $111.11.

Check that the arithmetic holds. 22 x $90.91 = $2,000.02, which rounds to $2,000. 18 x $111.11 = $1,999.98, also about $2,000. The figures are an example, but the logic is the same for any team: the fewer billable hours you have, the higher the rate each one must carry.

This is why non-billable time belongs in your rate card, not just in your time report. The post on how to write a rate card clients can understand shows how to present a rate that covers it.

Writing your rules down

Put the five questions and your rulings on a single page. Add two or three examples from your own work. Share it with everyone who logs time and revisit it after a month, when real edge cases have appeared.

If you are not yet logging time reliably, start with the habit. The post on time tracking habits that stick on a small team explains how. To see how much billable work is escaping, the list in where billable hours go missing is a good companion.

Next step

Take last week's time log and mark each entry billable, non-billable or billable but not billed using the five questions. Count how many entries you were unsure about. That count tells you which rule to write down first.

Free plan available

Ready to run it all in one place?

Projects, clients, time tracking and invoicing in one platform.