What is work in progress (WIP) for service businesses?
Work in progress is work you have done but not yet invoiced. Learn what counts, why it hides cash, and a simple weekly list to track it for a small service business.

Work in progress, usually shortened to WIP, is the value of work your team has already done for clients but has not yet invoiced. It sits in a gap between effort and cash, and small service businesses can lose track of it. This post defines WIP, shows how to put a number on it, and gives you a weekly method that takes about fifteen minutes.
What WIP means in a service business
In a factory, work in progress is half-built product on the floor. In an agency or consultancy there is no product on the floor, so WIP is the time and costs you have put into client work that has not yet appeared on an invoice.
Three things usually make up WIP:
- Hours logged against a project since its last invoice, valued at your billing rate.
- Out-of-pocket costs you will pass on to the client, such as stock images or a paid plugin, that are not yet billed.
- Milestone work that is finished but waiting for you to send the bill.
WIP is not the same as money owed. Once you send an invoice, the amount leaves WIP and becomes a receivable, which is money the client owes you. WIP is the step before that.
Why it matters
Unbilled work is a loan you make to your clients, interest free. If your team logs $4,000 of work a week and invoices only at the end of a project, you may carry several weeks of cost before any cash arrives. Payroll and software bills do not wait.
WIP also shows leakage. Hours that are worked but never invoiced can disappear quietly. They may be small extras the client asked for, or time nobody got around to billing. Seeing the list each week stops that.
Finally, it feeds other numbers. If you measure how much of your logged time becomes invoiced revenue, as described in what realization rate means in a service business, WIP is where the missing hours show up first.
A worked example
Say a small design studio checks its WIP on a Friday. These figures are an illustration, not a benchmark.
- Project A: 22 unbilled hours at $90 per hour. 22 x 90 = $1,980.
- Project B: 14 unbilled hours at $110 per hour. 14 x 110 = $1,540.
- Project C: 9 unbilled hours at $90 per hour, plus $120 of pass-through costs. 9 x 90 = $810, and $810 + $120 = $930.
Total WIP: $1,980 + $1,540 + $930 = $4,450.
Now look at age. Project A was last invoiced five weeks ago, Project B nine days ago, Project C three weeks ago. Project A is the one to bill first: it holds the most value and has waited the longest.
A simple weekly tracking method
You do not need accounting software for this. A shared sheet works.
- List every active project in a row.
- For each, record the date of the last invoice.
- Add the billable hours logged since that date and multiply by the rate for that work.
- Add any pass-through costs not yet billed.
- Add the row totals. That is your WIP.
- Mark any row older than 30 days, or any row with more than a set amount, as "bill this week".
Run it at the same time each week. After a month you will see a pattern, such as one project that always sits unbilled, and you can fix the cause.
If you use retainers, WIP behaves differently. The fee is invoiced on a schedule, so unbilled time is not the issue. The question is whether the hours you spend fit inside the fee. What is a retainer agreement covers how that arrangement is set up.
Counting the cost of time
Hours valued at your billing rate show what you could invoice. To see what that time costs you, include overhead. If you have not worked out the cost of running the business per hour, start with how to calculate your overhead rate, then compare it with the billing rate on each WIP row.
Only billable time counts. Internal meetings and admin are real costs, but they are not WIP. For a clear split between the two, see what a billable hour is.
HireOrSell supports this by letting you mark time entries as billable or non-billable against projects, and time entries integrate with invoicing. The Free plan does not include time tracking; check the pricing page for current plans.
This is general information about a business concept, not accounting advice. Accounting standards treat WIP in specific ways, so ask your accountant how to record it in your books.
Next step
Open your project list today and write down the date of the last invoice for each active project. Add the unbilled hours and costs, and you have your first WIP number. Send an invoice for the oldest row before you close the sheet.
Keep reading
- How digital marketing agencies manage retainers and reportingA practical routine for running marketing retainers: define monthly deliverables, budget the hours, and set a weekly, monthly and quarterly reporting rhythm clients can rely on.
- What is a retainer agreement?A retainer agreement is a contract for ongoing work at a recurring fee. See the parts it should contain, four common variants and a worked example of hours and overage.